Active plant
— of operating risk is tied to procedures this plant hasn't documented.
Close these first
Open risk register- Loading…
Ask the plant's documents
Answers cite the CEA guideline corpus and this plant's own records, or say plainly when something isn't documented.
What's being measured
- Plant documents
- —
- CEA & regulatory guidelines
- —
- Topics documented
- —
- Scored topics
- —
Every answer is retrieved from indexed passages.
Latest CEA forced outages
- Loading the CEA forced-outage feed…
| Station | Unit | MW lost | Equipment | Failure reason | Revenue impact | Date |
|---|---|---|---|---|---|---|
| Loading outages… | ||||||
Source: CEA daily outage reports (npp.gov.in), refreshed daily. Revenue impact at ₹5.0/kWh (LBNL/Ember 2024 India coal fleet average).
Risk (₹ Cr) = criticality (1–5) × consequence (₹ Cr, from CEA outage records) × exposure (1 − best match in the plant's documents).
Knowledge graph
Equipment, the ways it fails, the procedures that should cover each failure, the regulations that require them, and real CEA outages. A dashed red outline marks a failure mode with no complete procedure; select it to follow the chain to ₹.
Source: Neo4j knowledge graph built from CEA technical standards and daily outage reports.
Documents
The CEA standards and regulations that define what a well-run 500 MW plant should have on file. Every plant is scored against them. The shared CEA set can't be edited; guidelines you add apply only to the active plant and can be removed.
Documents
This plant's own SOPs, manuals, tariff petitions and inspection records — the material being scored. Topics the CEA baseline expects but no document here covers are shown as gap cards.
Remove this plant's data
Clearing deletes every document, indexed passage and gap score for the active plant. Deleting the profile also removes this browser's chat history for it. Neither can be undone.
Risk register
Live, read-only. Every ₹ figure traces to CEA outage records.
Priced gaps
How gaps are scored
A gap is a topic the CEA guideline baseline expects a plant to document, where this plant's own documents give weak or no coverage. Risk = criticality (1–5, sourced) × consequence (₹ Cr, from CEA forced-outage records at ₹5.0/kWh) × exposure (1 − best match in the plant's documents). Only topics with real CEA outage history for their equipment are priced here; the rest are listed under "Needs documentation" without a guessed figure.
| # | Equipment | Gap | Plant coverage | Outages linked | Risk |
|---|---|---|---|---|---|
| Loading the gap analysis… | |||||